Major infrastructure projects: controlling the interfaces

Overruns are born at boundaries: between packages, between parties, between design and execution.

ESA Alliance

· 5 min read

Consolidate design before committing

The cost of change grows at every phase. Investing in design consolidation protects the overall budget.

Map the interfaces

A continuously updated matrix of technical and contractual interfaces reveals risks that package schedules hide.

Integrated cost-schedule-risk steering

Tracking cost, schedule and risk separately hides their interactions. An integrated dashboard enables timely trade-offs.